POWER TRANSMISSION SUPPLY PROJECT – 33kV (1x400)

Committed to strengthening Iraq’s power infrastructure, Al-Sajed International Company executed the 33kV (1x400) Power Transmission Project to enhance the reliability and efficiency of high-voltage electricity distribution. The project encompassed the supply and installation of 33kV transmission cables, ensuring safe energy transfer to key industrial and infrastructure facilities through advanced engineering practices and strict quality control.
 
Our team executed all works including cable laying, jointing, termination, and high-voltage testing in compliance with international quality and safety standards. By utilizing certified materials and advanced testing technologies, the project was delivered with precision, durability, and long-term performance assurance. 

Through this project, Al-Sajed International reinforced its commitment to supporting national power infrastructure by delivering dependable energy transmission systems that meet the highest benchmarks of engineering excellence and operational safety. 

Project Highlights

Our project scope included full-scale material procurement, high-voltage installation, and testing — all executed under international standards to ensure long-term efficiency and reliability. 

Cable Procurement

Supply of 33kV (1x400) high-voltage power cables sourced from globally certified manufacturers, ensuring durability and compliance with IEC standards.

Installation & Testing

Professional laying, jointing, and termination of power cables followed by advanced high-voltage and insulation resistance testing to verify system integrity.

Quality Assurance

Strict adherence to safety procedures and quality management systems guaranteeing optimal performance, zero-fault operation, and client satisfaction.