POWER CABLE SUPPLY & TESTING PROJECT – 11kV (3x150)

Since its establishment, Al-Sajed International Company has been a trusted provider of electrical and infrastructure solutions that support industrial growth across Iraq. This project involved the supply, installation, and testing of 11kV (3x150) power cables, ensuring efficient and stable power transmission for critical operational facilities.

Our experienced electrical engineering team carried out high-voltage testing, jointing, and termination works in compliance with international standards and client safety requirements. By utilizing advanced testing equipment and certified installation techniques, the project was completed with precision, safety, and reliability — reinforcing our commitment to quality and operational excellence. 

 At Al-Sajed International, every power solution we deliver is designed to enhance system reliability, reduce downtime, and ensure long-term performance for our partners in the energy and industrial sectors.  

Project Highlights

Our scope included full cable testing, certification, and performance verification — ensuring that every segment of the 11kV network operates at peak efficiency and reliability. 

Power Cable Supply

Procurement and delivery of 11kV (3x150) power cables from globally certified manufacturers, ensuring durability and compliance with international standards.

Testing & Commissioning

High-voltage testing, insulation resistance checks, and termination works performed using advanced diagnostic equipment to verify operational integrity.

Quality & Safety Assurance

All activities were executed under strict quality control procedures and safety regulations, guaranteeing zero incidents and optimal performance reliability.